HIGHLIGHTS OF PROJECTS/POLICIES/INITIATIVES
PILLAR 5: INFRASTRUCTURE AND INDUSTRIALIZATION
POWER INFRASTRUCTURE •
Construction of a 3.75MW Independent Power Plant (IPP)•
Rehabilitation and connection of Erijiyan, Ikogosi and Ikogosi Resorts back to the National Grid to enhance the State tourism corridor•
Rehabilitation and connection of Ipole Iloro-Ekiti back to the National Grid•
Rehabilitation and reconnection of Ijan, Ilumoba, Aisegba, Agbado, Imesi, Ode, Isinbode, Egbe, Iro-Ayeteju and Omuo in Ayekire and Ekiti East LGAs and their LCDAs back to the National Grid•
Extension of 33KV network from 132KV Omisanjana transmission substation to Baptist High School and connection of Ilawe 33KV line with Erijiyan-Ekiti •
Installation of 500kVA 33/0.415 relief transformer at Ikogosi•
Extension of electricity from Eruku, Kwara State to agricultural zone in Iyemero and installation of transformers• Extension of electricity from Omuo-Ekiti to Eda-Ile, Ikun Oba, Araromi and Ilasa Ekiti•
Extension of 11kV Independent Power Plant (IPP) network to NTA streetlight sub station• Ongoing connection of the agricultural processing zone (APZ) in Ikole to the National Grid•
Ongoing replacement of conventional streetlight lamps with solar lamps as part of the State’s renewable energy roadmap•
Draft of Ekiti State Electric Power Sector Bill, 2023•
Purchase of outdoor switch module to migrate to 33kv power line, Ilokun, Ado Ekiti.
TRANSPORT INFRASTRUCTURE
Construction of 2m by 2m by 10.3m double cell box culvert in Efon Alaaye•
Reconstruction (excavation and casting) of Igbara Odo- Ikogosi Lined drain road project.•
Rehabilitation of Agric Olope-Moferere/ Agric Olope-Odo Ado Road (17.52% Completion)•
Rehabilitation & construction of box culvert, repair of failed portions and other auxiliary works on Igede-Ilawe Road•
Rehabilitation of Ado-Iworoko Road (23% completion)•
Additional works on the construction of major concrete works on Ado-Ilawe-Igbaraodo-Ibuji Road• Rehabilitation of Igbara Odo-Ikogosi Road (25% completion)•
Rehabilitation of Ilawe-Erijiyan Road (64.58% completion)• Reconstruction of Ikere-Ilawe Road (8.9% completion)•
Rehabilitation of Ado township roads (97.55% completion)• Rehabilitation of Ado-Ilawe Road (20% completion)•
Construction of G.R.A 3rd Extension Road, behind NTA, Ado-Ekiti •
Construction of Atlas (Ajebamidele)- Deeper Life-Alasia-Shepherd-Omisanjana Road, Ado-Ekiti •
Reconstruction of failed culvert and other auxiliary works in Efon Alaaye (58.6% completion)•
Completion of the Bus Terminal in Ado-Ekiti•
Extraction of roads within Ekiti State at geospatial data centre, using GIS software•
90% completion of the construction of passengers’ terminal at the Ekiti State Agro-Cargo Airport•
Completion of dredging activities between Ado and Ikere with 7,949 metres dredged in Ikere Road, Omisanjana, Ureje community and Poly Road to Emirin and Ekiti South-West LGA.
Dredged areas are:
Oreremope Community (behind Obasanjo estate) completed.
Olaoluwa- Omisanjana- Ureje- Alasia Community
Ado Poly Road Bridge to Emirin
Afao Road Bridge-Oshodi
Basirii- Olorunda Chanel
Crown Biz- Ayemi- Bolemo – Onola
Alasia-Housing estate
ongoing
Tinuola Parkview –Onola- Balemo axis